Skip to main content
skip to content Français Search
Start of main content
Boundary Dam Integrated Carbon Capture Integrity Management System

Planning for pipeline integrity

Estevan, Saskatchewan
  • CONTACT
 
Sectors
Services
Award of Excellence

When SaskPower needed to develop a CSA code-compliant integrity and safety loss management system for their one-of-a-kind CO2 pipeline project, they brought us in to help. This pipeline connects SaskPower’s processing plant to their storage facilities at the world’s largest carbon capture project: Boundary Dam.

Shortly after our Power team worked on the Boundary Dam facility design, SaskPower asked us to help them create a lifecycle operating philosophy for the interconnecting pipeline. We worked together to develop a system that would guide the planning, implementation, review, assessment, and continual improvement of the pipeline operations.

The document describes the corporate support that the system needs as well as the goals, objectives, and legal requirements that must be met. Key roles and responsibilities for persons involved as well as various policies and processes to be followed are also detailed.

With this pipeline safety and loss management system (SLMS), now tightly integrated within the corporation, SaskPower is better enabled to protect their people, their property, and the environment. 

View A Project Near You

Find Stantec projects near you
End of main content To top